To build this tool box you first need to place plywood on top and bottom. Glue was applied, as was 1.5" screws.
Here is the measurement to begin the sawing. The back of the box will be deeper than the front.
Here is where you start to saw. Yes, it needs to be cut all the way around the box the hard way, that is; with the grain of the wood
Here I am continuing to saw all the way around. By doing the cut this way, all corners of the tool box fit tightly into place. Notice: the big strong biceps I have. I also have great drops of sweat. Actual cutting time was only 1.5 hours.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment